I made some progress this weekend, but I`m still not able to size the slave cylinder. Saturday I picked up some aluminium and a boring bar set so that I could turn a bearing spacer on the lathe. The boring bars took a bit of set up time, but once I got everything lined up I managed to turn up a nice shiny spacer:
I had measured everything twice, and checked my calculations a few times, so this should have worked. Unfortunately, when I went to the other garage today and went to bolt things together, the bearing was spaced out too far. So after a few curse words, the dial calipers came out and I now know how much I need to remove from the spacer. But, that will have to wait till next weekend.
Other than that issue, I did manage to tidy up the rear chassis cross member, install the oil filter mount to it, machine up some bungs that got welded to the oil filter adaptor (there was no room for elbows so I welded on some bits) and as I had the cross member off the car, the rear sway bar mounts were fabricated today and installed (temporarily):
So, hopefully by this time next weekend I will have sorted the clutch and will have moved on to finalising the exhaust, along with a whole list of things to do. The current goal is to have the motor run inside the next month.
Rod